In the video, made Saturday on Saint Patrick's Day, early AM 3/17/2007, it shows a very bad piece of road on Ala Moana Boulevard in the Kaka'ako district of Honolulu, Hawai'i. The second scene of the video is Kewalo Basin at Ala Moana Boulevard and Ward Avenue.
Good news! This video was filmed right immediately before this piece of bad road is scheduled to be repaved in 2007.
In the March 22, 2007 edition of the Honolulu Advertiser, 'bureaucracy buster' Robbie Dingeman wrote "Both the state and city have been adopting a newer nationwide philosophy that include taking better care of newer roads so they don't end up in such bad condition."
Yes, extend life cycle of asphalt pavements through proper maintenance and repair but don't create a separate class of second-class roads. I called the department of transportation of Hawai'i about this article and asked "What about triage?" Triage is a system used to allocate a scarce commodity.
Limited resources with a never-ending upkeep in road maintenance means that triage must still be used in road repair priorities. I spoke specifically about downtown Honolulu, where Nimitz turns into Ala Moana near CompUSA. The friendly representative said that planned work for 2007, has already begun, and will continue to Punchbowl within a week.
Driving towards Diamond Head from where Nimitz turns into Ala Moana, the road conditions are bad to the point of becoming a negligent litigation suit waiting to happen. Litigation and risk management is part of the triage process in road maintenance and the Hawai'i department of transportation does the very utmost possible with the resources allocated. Building a short life span type of road that will need constant maintenance should not be made. Heavy trucks traveling over sandy and soft soil requires a concrete section.
Most of Honolulu's bus stops have a section of concrete in the bus lane. A concrete roadbed is required because of the repeated braking at the same spot over time warps the tar of the asphalt. This particular bus stop at the Forrest Avenue intersection is also the same corner where massive eighteen-wheelers turn right.
Even at higher initial costs, a concrete roadbed should be built at this section of the road. Although pouring cement causes more traffic woes to construct, due to the required days for the cement to 'set, in the long run, a series of "Band-Aid" fixes at a catch-up rate will cost more than would a long-lasting concrete section. Concrete slabs carry the weight of the vehicle load without rutting.
Budgets should not be so shortsighted with building at the lowest cost without considering upkeep for the next 50 years -lest Honolulu makes the same wasteful mistake such as the multi-million dollar swimming pool in Makiki, yet no budget for lifeguards and so it remains mostly closed.
Published by ptosis
Flexure of Reinforced Concrete BeamsLesson gives design equations with example and discussion for flexural strength of a reinforced concrete beam and also presents Code minimum and maximum reinforcement limits- Breaking a Plain Concrete BeamLesson describes and illustrates calculating the uniform and concentrated loads that will break a laboratory plain concrete beam. Also discussed are factors of safety.
- Native Hawaiian SpiritualityNative Hawaiian spirituality can be traced back thousands of years when ancient Hawaiians looked to the wind (makani, or life giving spirit) to nurture their spiritual well-being, and to assist them in crossing often...
The Top Steakhouses in HonoluluWhether you are a long-time resident or simply a tourist here to catch some sun, it is easy to overlook some of the best restaurants and steakhouses Honolulu has to offer. Here...
The Top Shopping in HonoluluHonolulu is one of the largest cities in the US and one of the finest cities in which to shop. Whether you're visiting Honolulu from the mainland or simply taking a day trip int...
- Local Restaurant Review: Alan Wong's Pineapple Room in Honolulu, Hawaii
- Calculating Self Weight of Structural Concrete
- Best Roof Protection: Concrete Roof Tiles
- Strength of a Reinforced Concrete Beam
- Beam Shear in Reinforced Concrete - Revised
- Introduction to Deflections of Reinforced Concrete Beams
- Shear Reinforcement in Reinforced Concrete Beams
- "Perpetual Pavement" can resist structural fatigue for at least 50 years.
- "Superpave" asphalt mix relies on more stone-to-stone contact, which lasts longer.
- Reclaimed asphalt pavement is recycled into hot mix asphalt.